WALL STREET AINDA ESTÁ MODELANDO $IREN ERRADO
WALL STREET AINDA ESTÁ MODELANDO 13 M POR MW ENQUANTO ELES ACABARAM DE ASSINAR 22 M POR MW E 40 M POR MW
$IREN ainda tem 900-1000 MW para assinar em 2027 e 2028
OBJETIVOS DE PREÇO NO FINAL DO ANO-CALENDÁRIO DE 2028 SE OS NOVOS ACORDOS TIVEREM A MÉDIA DE:
20 M por MW
$23.9B ARR
1.46 P/S = $82.23
2.0 P/S = $112.64
3.0 P/S = $168.96
4.0 P/S = $225.28
25 M por MW
$28.9B ARR
1.46 P/S = $99.43
2.0 P/S = $136.21
3.0 P/S = $204.31
4.0 P/S = $272.41
30 M por MW
$33.9B de receita anual
1.46 P/S = $116.63
2.0 P/S = $159.77
3.0 P/S = $239.66
4.0 P/S = $319.54
40 M por MW
$43.9B de receita anual
1.46 P/S = $151.04
2.0 P/S = $206.90
3.0 P/S = $310.35
4.0 P/S = $413.80
WALL STREET AINDA ESTÁ MODELANDO 13 M POR MW ENQUANTO ELES ACABARAM DE ASSINAR 22 M POR MW E 40 M POR MW
$IREN ainda tem 900-1000 MW para assinar em 2027 e 2028
OBJETIVOS DE PREÇO NO FINAL DO ANO-CALENDÁRIO DE 2028 SE OS NOVOS ACORDOS TIVEREM A MÉDIA DE:
20 M por MW
$23.9B ARR
1.46 P/S = $82.23
2.0 P/S = $112.64
3.0 P/S = $168.96
4.0 P/S = $225.28
25 M por MW
$28.9B ARR
1.46 P/S = $99.43
2.0 P/S = $136.21
3.0 P/S = $204.31
4.0 P/S = $272.41
30 M por MW
$33.9B de receita anual
1.46 P/S = $116.63
2.0 P/S = $159.77
3.0 P/S = $239.66
4.0 P/S = $319.54
40 M por MW
$43.9B de receita anual
1.46 P/S = $151.04
2.0 P/S = $206.90
3.0 P/S = $310.35
4.0 P/S = $413.80
