VIVIFY Technology is testing a hydrogen power unit in Florida with a 65-kilowatt load bank as it seeks to bypass long grid interconnection waits for data centers. Jason Herring said the Flying Pig unit could provide 1 megawatt of power within 15 minutes, but VIVIFY is still building a system to validate energy inputs and outputs.
