๐ฌ Yuanjie Semi channel check drops some spicy supply chain intel:
๐ CW laser capacity so tight they can't even supply Eoptolink right now โ bullish for merchant laser players who can actually deliver
๐ InP substrate prices jumped "several percentage points" in Q4 2026. Sumitomo's capacity? 80% already locked by InnoLight. Margins compressing from 80%+ toward 60%+ but still fat
๐ 300-400mW lasers heading to $NVDA for NPO architecture as external sources. Yuanjie positioning as core NPO supplier since $LITE is capacity-constrained and pivoting to CPO
๐ MOCVD equipment lead times stable at ~12 months (no change for $AIXA)
๐ CW lasers = 80% of revenue mix (60% from 70mW, 33-34% from 100mW)
๐ DSP chip shortages NOT yet a major bottleneck in their calcs โ but $AAOI and others are feeling it
๐ 1.6T transceivers WON'T use 4x 70mW lasers. Current architecture only needs 2x 100mW lasers
๐ง Takeaway: Laser supply chain still tight, InP substrate pricing firming, and NPO ramp could be a meaningful tailwind for merchant laser suppliers who aren't capacity-choked. Watch $AXTI, $LITE, $AAOI dynamics closely as bottlenecks shift around
๐ CW laser capacity so tight they can't even supply Eoptolink right now โ bullish for merchant laser players who can actually deliver
๐ InP substrate prices jumped "several percentage points" in Q4 2026. Sumitomo's capacity? 80% already locked by InnoLight. Margins compressing from 80%+ toward 60%+ but still fat
๐ 300-400mW lasers heading to $NVDA for NPO architecture as external sources. Yuanjie positioning as core NPO supplier since $LITE is capacity-constrained and pivoting to CPO
๐ MOCVD equipment lead times stable at ~12 months (no change for $AIXA)
๐ CW lasers = 80% of revenue mix (60% from 70mW, 33-34% from 100mW)
๐ DSP chip shortages NOT yet a major bottleneck in their calcs โ but $AAOI and others are feeling it
๐ 1.6T transceivers WON'T use 4x 70mW lasers. Current architecture only needs 2x 100mW lasers
๐ง Takeaway: Laser supply chain still tight, InP substrate pricing firming, and NPO ramp could be a meaningful tailwind for merchant laser suppliers who aren't capacity-choked. Watch $AXTI, $LITE, $AAOI dynamics closely as bottlenecks shift around
