CFME rides the AI PCB wave: shipments above 1,000 tools, capacity expansion under way
$9630.HK
GOLDMAN SACHS | ALLEN CHANG, VERENA JENG • 9 November 2026
1. What did Goldman Sachs find on its visit to CFME?
• Goldman Sachs visited CFME management in Hong Kong to discuss capacity expansion, supply chains and downstream capex.
• Management remains constructive on its multi-year growth trajectory, backed by resilient equipment demand from tier-1 PCB fabricators.
• CFME is not covered by Goldman Sachs — this is a management-visit note, with no rating or price target.
2. Why is AI server PCB demand the tailwind here?
• Goldman Sachs expects the global AI server PCB market to reach US$38bn by 2027E (raised from US$27bn), then US$84bn by 2028E — a 148% 2026–28E CAGR.
• Leading US cloud providers are forecast to grow capex 84%/52%/13% YoY in 2026E–28E, to US$1,397bn by 2028E; Chinese cloud platforms are seen growing 105%/21%/14% YoY.
• With capacity still expanding and utilisation high, Goldman Sachs stays constructive on AI PCB and CCL.
3. How fast is CFME's core PCB equipment business growing?
• Core PCB exposure tool shipments are tracking above 1,000 units in 2026, with mid-double-digit growth anticipated in 2027.
• High-end tools are set to exceed half of 2027 shipments, lifting blended average selling prices.
• Management sees customers' capacity expansion and capex as healthy, with little evidence of a slowdown across tier-1 fabricators.
4. What can IC substrates and advanced packaging add?
• IC substrate equipment order intake is guided to expand to roughly a few hundred units in 2027, capturing a strategic two-year domestic substitution window.
• CFME delivers in 4–5 months, versus 12–18 months for Japanese peers.
• Advanced packaging is management's highest-growth catalyst, with robust order visibility as customers migrate to large-format panel-level packaging.
5. Can CFME actually deliver on the expansion?
• Management is scaling up to multi-billion-RMB annual output value through 2027, backed by its Hefei facilities and a planned greenfield base in 2028 (Hefei vs Shenzhen).
• To ease laser-drilling bottlenecks it is locking in annual CO2 laser procurement deals and domestic component substitution, targeting over 100 drilling unit deliveries in 2027 and c.1,000 net technical hires across 2026–2027.
• Overseas, it favours an asset-light partnership in Malaysia for rapid delivery by 2Q–3Q27, to serve international orders and mitigate compliance and country-of-origin risks.
• Watch execution: hiring, laser supply and overseas delivery must keep pace with orders — or the growth story slips.
#PCB #AIServers #Semiconductors #ChinaTech #AdvancedPackaging
Source: Goldman Sachs, "China PCB: CFME (9630.HK/688630.SS, NC): Mgmt visits: PCB to drive growth ahead; Capacity expansion ongoing", 9 November 2026. Based solely on the report provided; forecasts are not guaranteed. For reference only; not investment advice.
Read the full breakdown on Unhidea: https://unhidea.com/en/articles/research-e89d12082b51444ea649f2905787cb0e-en
Visit unhidea.com for more of the latest sell-side research interpretations.