Elon just got permission to put 1 MILLION data centers in space.

This is not sci fi. This is real. And it just happened.

The FCC just approved SpaceX Starmind. The first authorization in US history for data centers in space. Up to 1 million orbital compute satellites.

Why does this matter for chips?
Because every single satellite needs Nvidia.

SpaceX chose Nvidia as its exclusive AI chip supplier. Each Starmind AI1 satellite runs an optimized Vera Rubin NVL72 system. That is 72 Rubin GPUs plus 36 Vera CPUs per satellite. Solar powered.

Do the math. Just 10,000 satellites means 720,000 Rubin GPUs. 100,000 satellites means 7.2 MILLION GPUs. A whole new demand layer on top of Earth data centers.

Earth data centers are hitting a wall. No power. No land. No water. Communities are protesting. Musk says orbital is the only way beyond terrestrial limits.

Google is testing Suncatcher in orbit. Blue Origin filed Project Sunrise. Starcloud flew an H100 in space. The race is on.

Timeline is aggressive. First Starmind launch in Q3 2027. FCC deadline is 100,000 satellites by 2035. 500,000 by 2038. Full million by 2040.

Risks are real. Radiation. Debris. Launch cost. Starship must work. But if it works, Nvidia demand goes parabolic.

Coins to watch: $NVDA $SPCX $BTC $ETH

#SpaceX #NVIDIA #AI #crypto
#CouldSpaceX’sOrbitalDataCentersBoostAIChipDemand?
Is Space:
The next Nvidia supercycle
Or just hype
6 дн. осталось