Fresh TPU supply-chain estimates highlight why $GOOGL is splitting its 2027–2028 silicon roadmap between$AVGO and MediaTek—it's a trade-off between CoWoS capacity, unit margins, and execution risk.
According to industry checks, TSMC's CoWoS capacity is booked through 1H28 with $NVDA holding ~60%, which already capped Broadcom's 2026 TPU output at ~3.6M units versus a 4.2M target. To scale toward 8M–9M total TPUs in 2027, Google is routing MediaTek's ramp (2.5M–3M units) and the unified TPU v9 (1Q28) onto $INTC's EMIB packaging to bypass the CoWoS bottleneck.
The commercial math explains the rest: • Broadcom (Turnkey ASIC): Estimated $5.5K–$6K ASP on TPU 8i at ~55% gross margin. • MediaTek (Interface + Packaging): Estimated $2K–$2.5K ASP at 40%–45% margin, with Google procuring HBM directly.
Cutting out turnkey margin and CoWoS bottlenecks introduces real technical friction. Intel's EMIB yields aren't fully proven at scale, and MediaTek's SerDes gap may keep initial TPU v9 units at 336G instead of the 448G target.
Demand visibility is the other watch item. With external buyers rising from ~20%–25% of TPU volume in 2026 to ~50% in 2027, Anthropic's 3.5GW deal (~2M–2.5M units, or ~25% of 2027 output) is the swing factor. Any mid-December downward revision tied to data center delays would immediately test how tight that 2027 packaging queue really is.
#stocks
According to industry checks, TSMC's CoWoS capacity is booked through 1H28 with $NVDA holding ~60%, which already capped Broadcom's 2026 TPU output at ~3.6M units versus a 4.2M target. To scale toward 8M–9M total TPUs in 2027, Google is routing MediaTek's ramp (2.5M–3M units) and the unified TPU v9 (1Q28) onto $INTC's EMIB packaging to bypass the CoWoS bottleneck.
The commercial math explains the rest: • Broadcom (Turnkey ASIC): Estimated $5.5K–$6K ASP on TPU 8i at ~55% gross margin. • MediaTek (Interface + Packaging): Estimated $2K–$2.5K ASP at 40%–45% margin, with Google procuring HBM directly.
Cutting out turnkey margin and CoWoS bottlenecks introduces real technical friction. Intel's EMIB yields aren't fully proven at scale, and MediaTek's SerDes gap may keep initial TPU v9 units at 336G instead of the 448G target.
Demand visibility is the other watch item. With external buyers rising from ~20%–25% of TPU volume in 2026 to ~50% in 2027, Anthropic's 3.5GW deal (~2M–2.5M units, or ~25% of 2027 output) is the swing factor. Any mid-December downward revision tied to data center delays would immediately test how tight that 2027 packaging queue really is.
#stocks