Ship carrying 1,881 tons of cargo arrives in Guanta for the oil sector

A 190-meter-long vessel completed a roughly 45-day voyage before arriving at the Guanta terminal with 1,881.63 tons of general cargo.

According to Bolipuertos, the equipment for the oil sector will be sent to El Tigrito, in the municipality of San José de Guanipa, near hydrocarbon extraction areas in eastern Venezuela.

The oversized pieces were unloaded using a Liebherr LHM 420 mobile crane at berth five, alongside the ship’s cranes, reducing operating times.

Bolipuertos noted that Guanta’s proximity to energy hubs in the east makes it easier to transport machinery to industrial projects.

#PortOfGuanta #Bolipuertos #OilSector #Anzoategui #Venezuela
$TRX