Tesla is turning Giga Berlin into its autonomy factory for Europe 🇩🇪

Giga Berlin plant manager André Thierig shared more details about the expansion:

• Around €3 BILLION in initial investment
• A brand-new manufacturing hall in Grünheide
• Construction scheduled to begin in H1 2027
• Cybercab production starting in 2029
• Annual production capacity of up to 1 MILLION Cybercabs

And that €3 billion doesn't even include the production machinery

Tesla is still evaluating new manufacturing technologies, and Thierig hasn't ruled out the possibility that the production equipment will cost more than the factory building itself

For perspective, Giga Berlin reached a production milestone of 7,000 Model Ys in a single week in October, equivalent to 364,000 vehicles annually

The new Cybercab facility at full capacity would produce nearly three times that volume alone

And all these vehicles are designed to operate autonomously, without steering wheels or pedals

André Thierig on Tesla's ambitions:

“Tesla has often taken a pioneering role. We want to lead again in autonomous road traffic”

Europe is next