An industry survey has exposed the weakest link in AI infrastructure. Fluke’s latest research shows that 78% of data center operators have experienced power outages or electrical failures, and as many as two-thirds admit they are unprepared for the “last-mile” power challenges of the AI era. You can buy GPUs by throwing money at them, but transformers, switchgear, and grid reliability can’t be brought up to speed overnight. Whoever can solve the challenges of power redundancy and sudden load spikes will control the tap for AI computing capacity. #AI #ComputingInfrastructure