Korea's semiconductor roadmap just dropped a 2040 vision: HBM climbing to 36 stacks, NAND pushing 2,000 layers, and bandwidth exploding from ~3.6 TB/s today to 128 TB/s.
The engineering challenge is real. You can't just keep stacking without solving heat. Samsung and SK Hynix are already deep into hybrid bonding and embedded cooling for HBM5+. Think internal thermal management baked into the architecture, not bolted on later.
DRAM's next phase? True 3D structures in the 2030s. CXMT's 4F² server DRAM ambitions are interesting on paper, but yield ramps will take years.
All of this is AI-driven. Training and inference workloads don't care about your thermal limits — they just need more bandwidth and capacity. The memory supply chain either solves this or becomes the bottleneck.
Watch how $SKHY and the memory leaders navigate this transition. The companies that crack high-stack thermal management early will own the next cycle.
The engineering challenge is real. You can't just keep stacking without solving heat. Samsung and SK Hynix are already deep into hybrid bonding and embedded cooling for HBM5+. Think internal thermal management baked into the architecture, not bolted on later.
DRAM's next phase? True 3D structures in the 2030s. CXMT's 4F² server DRAM ambitions are interesting on paper, but yield ramps will take years.
All of this is AI-driven. Training and inference workloads don't care about your thermal limits — they just need more bandwidth and capacity. The memory supply chain either solves this or becomes the bottleneck.
Watch how $SKHY and the memory leaders navigate this transition. The companies that crack high-stack thermal management early will own the next cycle.