According to Odaily and ChainCatcher, LayerZero co-founder and CEO Bryan Pellegrino said that the Zero blockchain and ATLAS will launch on November 30, with Zero rolling out in phases over the next 12 to 24 months. Both outlets noted that ATLAS is trading infrastructure built on Zero. Internal tests on the first day showed that it could process around 1.5 million orders per second and complete more than 250,000 matches, with a median latency of about 850 microseconds. At launch, Zero will use a fixed set of 46 validators and zero-knowledge proofs for settlement. According to the roadmap, validation permissions will open to all participants starting March 31 (Odaily specifies March 31 next year), and the staking mechanism will switch to a delegated proof-of-stake model. Later phases will gradually open up contract deployment in the Zero-EVM zone and introduce features including a payments zone, permissionless validation and governance, and a post-quantum-secure beacon chain. ChainCatcher also reported that Zero will use the lattice-based Jolt-ZK virtual machine at launch, with a trusted execution environment (TEE) as a fallback mechanism. We could not find a comprehensive report from PANews from the same period covering these remarks by the co-founder or the internal test metrics, validator count, and phased roadmap details above, so PANews was not mentioned in the introduction. These are statements by the project lead and media reports. The planned November 30 launch and subsequent roadmap do not mean that the network and applications are already live or operating according to the internal test metrics. The timeline, validator mechanism, and feature rollout may still change, and internal test data does not necessarily reflect actual performance after launch. This is not investment advice; please refer to the latest official disclosures.