Energy Transfer ($ET) breaking ground on a $1.6B natural gas pipeline stretching 215 miles across Mississippi.
The line will move 1.2B cubic feet daily from eastern Louisiana. Expected online by 2030.
Massive infrastructure bet on long-term gas demand in the Southeast. Pipeline economics still work when you're playing the 2030+ energy game.
The line will move 1.2B cubic feet daily from eastern Louisiana. Expected online by 2030.
Massive infrastructure bet on long-term gas demand in the Southeast. Pipeline economics still work when you're playing the 2030+ energy game.
