Everyone’s racing to build the next gigawatt campus.

But the grid wait can be 5-10 years.

It doesn’t apply to GPUs that are already built, already powered, already permitted.

And right now, a lot of them are sitting idle.

You don’t need a new campus. You need the capacity that’s already plugged in.

Skip the queue. Run on what exists with @ionet.

https://io.net/blog/the-physical-limits-of-the-data-center-build-out